Small mounting opening
The installation opening is selected for the standard or Mini fluidizer.
Improve Powder Discharge | Reduce Material Hang-Ups | Simplify Maintenance
Is material bridging over the outlet, forming a central flow channel, or clinging to the hopper walls? Rate Technology Systems helps review your material, vessel geometry and operating conditions to select an appropriate Solimar solution. Explore disk fluidizers, pneumatic air knockers, external installation kits, sanitary mounting options and aeration controls for dry bulk handling applications.
Get a Material RecommendationSolimar · Canadian application support from RTS
Add aeration where a new compact mounting opening is preferable to a larger access plate.

Your job: install a fluidizer through a smaller external opening.
Fast-Fit allows the flexible fluidizer disk to be inserted through a prepared opening from outside. An alignment plate, sealing components and retaining aid support installation. RTS helps distinguish this approach from EZ-IN, which is primarily selected around an existing pad opening.
Example: Add a new fluidizer mounting point to a compatible small hopper without a large retrofit plate.
Also known as: Fast-Fit aerator kits, external fluidizer mounting kits, compact aeration mounts.
The installation opening is selected for the standard or Mini fluidizer.
The flexible disk passes through the opening before the outside components are secured.
The plate and retaining aid assist positioning during assembly.
Prepare and deburr the specified mounting opening.
Insert and align the fluidizer using the supplied installation method.
Secure the assembly and connect the reviewed air supply.
Coordinate the mounting point with the vessel supplier.
Check space to fit the disk and secure the outside assembly.
Choose contact materials and an air arrangement appropriate to the process.
Suitability depends on the specific material and installation. RTS reviews flow behaviour, geometry, operating conditions and the process requirements together.
Solimar shows the external installation sequence. Use the model-specific instructions for opening dimensions, assembly and tightening details.

Start with the material and a hopper or vessel drawing. For fast-fit fluidizer kits, RTS also needs to understand the specific duty: install a fluidizer through a smaller external opening.
Is this a new mounting point or an existing opening? What are the wall thickness, curvature and available external clearance?
Send photographs and dimensions of the existing mounting and nearby equipment. RTS will coordinate a fit review before a replacement or new mounting arrangement is proposed.
Use the model-specific instructions for installation and maintenance. RTS can help confirm the selected assembly against the current application.

Coordinate when and where aeration runs
Pulse and sequence the air supply around the discharge process instead of leaving every aerator on continuously.

Reach the hopper interior for inspection
Provide a practical external opening for inspection and fluidizer access on compatible vessels.

Keep dry powder moving toward the outlet
Aerate the material at the hopper wall to help reduce bridging, ratholing and retained product.
Send a photo or drawing and tell us what happens during discharge. RTS can help narrow the options and coordinate the application review with Solimar.